•  Well A recovers crude production

  •  Well B surpasses initial production

Mayes Well

Details

  •   Arkoma Well A is a horizontal well drilled in June 2017 in Oklahoma with a vertical depth (TVD) of 6,500 feet and lateral length of 6,000 feet.
  •   Prior to treatment, the well was producing 1,276 MCFD and 6 BOPD

Treatment #1

  •   On April 25, 2019 Arkoma Well A was treated using a nanoActiv® HnP treatment with ~7,000 gallons of nanoActiv® blend pushed by 1,600 MSCF of N₂ over approximately 55 hours.

Results

  •   Within 30 minutes of beginning the treatment, the pressure of the offset well began to increase, indicating the two wells were communicating. The offset well was shut-in for the remainder of the treatment. Once the treatment was complete, both wells were shut-in for more than 48 hours and reopened.
  •   The decline curve flattened out, adding an incremental ~10,000 MCF to the production. Prior to treatment, the 30-day rolling daily decline of the two wells was .063% daily or 23% annualized. 4-months post-treatment, the 30-day rolling daily decline rate improved to .031%.

Details

  •   Arkoma Well B is an offset well to Arkoma Well A, located on the same pad site.
  •   Prior to treatment, the well was producing 1,517 MCFD and 8 BOPD.

Mayes Well

Treatment #2

  •   On August 26, 2019 Arkoma Well B, the offset to Arkoma Well A, was treated with ~14,000 gallons of nanoActiv® blend and 10,000 MSCF of N₂. The treatment was injected into Well A again.
  •   Because of the communication between Wells A and B, to treat Well B, the injection had to be in Well A again.
  •   Both wells were then shut in for a minimum of 72 hours.

Results

  •   Treatment #2 added an incremental 122,000 MCF to production in 180 days.